AeroBarrier Virginia builds happy clients in comfortable homes.

Our single step controlled air sealing process stops cold air in the winter and hot humid air in the summer. We protect your home from moisture and condensation that rots wood and grows mold. We allow builders and homeowners to properly size HVAC systems & make any insulation more effective.

  • More Comfortable Homes

  • Improved Efficiency, Saves $$$

  • Improved Air Quality

  • Prevents Mold, Dust and Pollen

Every year clients save $375 on heating & cooling*

See How It Works....png

AeroBarrier prevents over 50 pints of water vapor from entering your walls over a single Virginia winter.

 
Residential.png

We are the ONLY controlled single step air sealing solution. Builders typically spend between $3500-$25,000 to achieve the same results an AeroBarrier application can guarantee for a fraction of the cost. If you care about building comfortable, efficient and healthy homes but are still not using AeroBarrier Virginia, you are paying too much!

 
Residential (1).png
 
Leaky homes are drafty, uncomfortable and cost significantly more to heat and cool…

Leaky homes are drafty, uncomfortable and cost significantly more to heat and cool…

AeroBarrier homes are comfortable, more efficient and have better air quality.

AeroBarrier homes are comfortable, more efficient and have better air quality.


Our Partners…

Untitled design (17).png

The 5-Step Application Process

Aerobarrier_begin-process.jpg

1. Setup

Equipment is set up at the job site. Conveniently transported by trailer, AeroBarrier install equipment is mobile and portable. The equipment includes a compressor, generator, blower door, emitters, hoses, and the AeroBarrier machine.

Aerobarrier_step2-prep.jpg

2. Prep

Prep the space. This includes taping or covering any areas that won’t be sealed. Emitters are then set up throughout the area to be sealed.

Aerobarrier_step3-pressurize.jpg

3. Pressurize

Pressurize the space with the use of a blower door. A computer does the rest, including the control of temperature, pressure, humidity, and distribution of sealant during the process.

Aerobarrier_step4-seal-realtime-results.jpg

4. Seal

See the results in real-time. Throughout the application process, the computer monitor displays the ACH improvement, allowing you full control over your desired level of envelope tightness and the leakage reduction.

Aerobarrier_step5-certificate.jpg

5. Certify

Run a final blower door test to verify the sealing results. At the end of the process, receive an AeroBarrier Certificate, with a pre and post leakage report.


Send a message Or Call Us: (434) 282-4622

Name *
Name
Phone
Phone
10 digit phone number
 

*Study based on a 4 ach50 reduction from 6 ach50 to 2 ach50 in a 2000 sq ft home.